ASTM E2013 - 26
Standard Practice for Developing Functions, Constructing FAST Diagrams, and Performing Function Analysis During Value Engineering (VE)/Value Analysis (VA) Study
| Warning: | ASTM standards for reading are viewed through the client area. The files cannot be downloaded. |
|---|---|
| Edition date: |
2026-04-01
In Force
|
| Available languages: | English |
| Summary: | |
| Keywords: | building economics; cost efficiency; cost/preference combinations; function analysis; function analysis system technique (FAST); project planning; return on investment; risk analysis; UNIFORMAT II; value engineering; |
| Scope: | 1.1 This practice covers a logical structure for the function analysis of a project, product, or process. 1.2 This practice provides a system to identify, define, and clearly communicate the purpose of a project, product, or process and the associated elements of the project, product, or process. 1.3 This practice covers the relationship between the functions that must be satisfied and the resources for a project, product, or process to accomplish those functions. 1.4 The values stated in SI units are to be regarded as standard. The values given in parentheses after SI units are provided for information only and are not considered standard. 1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use. 1.6 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee. |
| ICS: | 91.010.99-Other aspects |
| CTN: | E06.81 - E06.81 |
|
Standards Cancellations |
Anula a E2013 - 20 |
|
Otras Relaciones |
Es referenciada por E2103/E2103M - 19(2024) Es referenciada por E2168 - 10(2023) Es referenciada por E3377 - 24 Es referenciada por E3008/E3008M - 16(2023) Es referenciada por E3035 - 15(2025) Es referenciada por E1699 - 26 |