NF EN 50549-10
Requirements for generating plants to be connected in parallel with distribution networks - Part 10: Tests for conformity assessment of generating units
| Fecha edición: |
2022-10-28
En Vigor
|
|---|---|
| Idiomas disponibles: | Inglés, Francés |
| Keywords: | ELECTRIC POWER NETWORKS|PUBLIC NETWORKS|ELECTRIC POWER DISTRIBUTION|POWER SUPPLIES|ELECTRIC POWER STATIONS|ELECTRIC GENERATORS|ELECTRICAL INSTALLATION|JUNCTIONS|ESTIMATION|CONFORMITY TESTS|TYPE TESTING : TESTS|ELECTRIC POWER GENERATION|ELECTRIC POWER|PERFORMANCE EVALUATION|MEASURING INSTRUMENTS||OPERATING FREQUENCIES|WORKING RANGE|ELECTROMAGNETIC COMPATIBILITY|CONTROL DEVICES|PROTECTION|FAILURE|PRODUCTION NOTIFICATION|MODELS |
| ICS: | 29.160.20 - Generadores (alternadores), 29.160 - Máquinas eléctricas rotativas, 29 - ELECTROTECNIA |
| CTN: |










