DIN EN 12953-6:2025-09
Shell Boilers - Part 6: Requirements for equipment for the boiler; German version EN 12953-6:2024
| Fecha edición: |
2025-09-01
En Vigor
|
|---|---|
| Idiomas disponibles: | Inglés, Alemán |
| Resumen: | This document specifies the minimum requirements for safety related equipment for shell boilers (generator and/or assemblies) as specified in EN 12953-1:2012, to ensure the boiler operates within the allowable limits (pressure, temperature, etc.) and if the limits are exceeded the energy supply shall be automatically interrupted and locked out, irrespective of the degree of intervention. NOTE 1 For this European Standard, the term "boiler" is applicable for generator and/or assemblies. NOTE 2 The maximum time of operation without manual (human) intervention can be specified for each boiler system. NOTE 3 Annex C (informative) gives recommendations of operation and testing of the boiler system with a maximum time of operation without manual (human) intervention of 24 hours and 72 hours. |
| Keywords: | Big boilers|Boiler plants|Calorifiers|CE marking|Definitions|Design|Emptying devices|Equipment|Excess pressures|Feedback control device|Heat|Hot water|Hot-water generations|Installations in need of monitoring|Kettles|Large waterspace boiler|Limiting equipment|Materials|Pressure vessels|Protection devices|Pumps|Safety|Safety devices|Safety engineering|Safety requirements|Specification (approval)|Steam boilers|Steam generators|Surveillance (approval)|Telltales|Temperature measurement|Testing|Valves|Water preheaters |
| ICS: | 27.060.30 - Calderas e intercambiadores de calor |
| CTN: | |
|
Equivalencia Internacional |
Idéntica EN 12953-6:2024 |
|
Reemplazo Normas |
Reemplaza a DIN EN 12953-6:2011-05 Reemplaza a DIN EN 12953-6:2023-07 |










